Day 05
Where the wall and sidewalk meet in a tunnel. Also the connection of wall-elements, this needs to be semi-flexible to prevent breaking when temperatures change.
Day 05
Where the wall and sidewalk meet in a tunnel. Also the connection of wall-elements, this needs to be semi-flexible to prevent breaking when temperatures change.